Problem of 2 main designs reachs a solution
This project although water supply measures way of not big, canal not quite, but have as Sunday run control water supply pipeline, its dimensions is affirmatory, section is decorated, provide material alternative, water hammer defends design, accessary establishment is designed, cross river building design, cross the problem such as protection to answer landform complex, pressure tall, project is main wait and appear important all the more.
2.1 systems dimensions is affirmatory
Project of water supply carrying hill on the head basically is to solve construction to use water special build, later period uses water as afforest and continue to use, characteristic of the disequilibrium sex that its design should use water according to construction, user and dimensions of affirmatory water supply. Decorate according to construction overall planning, top hill applies work area region to press balanced production day to 3 springs highest water consumption sees a table 1.
Express a hill to come 3 springs
Serial number
Project
Picket sign (Km)
Length (Km)
Water is measured (M3/d)
Remarks
1
Carry hill Sui hole on the head
15 340 of 0 150 ~
15.18
960
Life production uses water
2
Channel
23 308 of 15 340 ~
7.97
220
Life production uses water
3
Small depression chamfer pours siphon
28 509 of 23 308 ~
5.201
480
Life production uses water
4
Channel
142 137 of 28 509 ~
113.628
1540
Life production uses water
5
Big depression chamfer pours siphon
153 013 of 142 137 ~
10.876
850
Life production uses water
6
Administrative office
142 137
50
The life uses water
7
Aggregate
153.013
4100
On one page | Issue one page